Project Highlights

Illinois Statewide Congestion Analysis Study
- Client: Illinois Department of Transportation
- Contract: IDOT PTB 168, Item 29 – $1.49 million
- Dates: May 2014 to May 2016

I-355/Veterans Tollway – Phase III Construction Inspection – Pavement Preservation
- Client: Illinois Toll Highway Authority
- Contract: PSB 17-3 Item 26, RR 17-4340

Tri-State Tollway Roadway and Bridge Rehabilitation
- Client: V3 and Michael Baker International, Inc.
- Contract: Illinois Tollway PSB 17-3, Item 7, I-17-4302

IL-62 – Phase I Engineering and Environmental Study
- Client: Epstein
- Contract: IDOT PTB 168, Item 1

I-294 at Irving Park Interchange Feasibility Study
- Client: Christopher B. Burke Engineering, Ltd.
- Contract: Illinois Tollway RR-18-4383MP
About The Author